In Progress

Industrial Plant
No
Projects
Value
(billion)
1
  Steel Fabrication B-40(PT Wahana Sentra Niaga)

1,27

2
  EPC Tie-in Geothermal Power Plant Dieng

49,85

3
  Steel Structure for Balley Type DS B51 and 54m (PT Bhakti Pertiwi)

2,19

4
  Steel Structure for Balley Type DS B21 and 36m (CV Triasa)

1,2

5
  Steel Structure for Balley Type DS (PT Kencana Cakra Buana)

1,25

6
  Steel Fabrication for Balley Bridge Banda Aceh (PT Bimara Transia)

5,13

7
  Steel Fabrication Sleepers (Sismidth)

8,3

8
  Steel Fabrication B-40 (PT Bukaka Teknik Utama)

3,29

9
  Crude Oil Pipeline Tampino-Plaju (Pertamina)

134,56

Total Page | 3 |123
Copyright © 2011 – PT. Wijaya Karya (Persero). Tbk, All rights reserved