Indonesia's Leading Integrated EPC & Investment Company

Period: 7 September 2010, High: 610,  Low: 590, Close: 600, Vol 10,441,000, Val: 6,276,780,000

»Home - Bussiness Unit - Industrial Plant, Oil & Gas
Industrial Plant, Oil & Gas
Civil Construction  
Building Construction  
Industrial Plant, Oil & Gas 
Energy  
PKS SamsamIn the energy field, especially electrical, has been an area of expertise since WIKA's establishment in 1960. With a long history of success that has resulted array of projects implementation experiences in distribution network, from middle, high to extra high-voltage transmission network, and main relay station.
 
As the first Indonesian constructor to ever worked on extra high-voltage 275 KV transmission line in Asahan - North Sumatra in 1979, WIKA has also worked on diverse transmission projects through out Indonesia, from 70 KV, 150 KV, 275 KV to 500 KV voltage, using concrete poles, steel poles, and steel tower frame.
 
WIKA has also completed projects related to main relay station, ranging from middle-voltage for industry and PLN needs, to high voltage.
 
In the telecommunication field, WIKA has constructed tower and anten
 
As part of its effort to constantly grow, WIKA manages mechanical and electrical construction services, which include the constructions of oil and gas facilities and industrial infrastructure construction.
 
Oil and Gas Sub-Business
WIKA has constantly expanded its oil and gas operation especially in pipeline, tank farm, and gas terminal
construction, including the construction of fuel collection station and gas processing plant. Some of WIKA’s well done projects include the Paket 14 of gasdistribution pipeline network in West Java, while the ongoing project is the Balongan-Jakarta oil-distribution pipeline project.
 
Industrial Facilities Sub-Business Line
WIKA has grown stronger in the industrial facilities construction sector by providing services in the industrial estates and industrial building construction, such as crude palm oil plant, bio-diesel and bio-ethanol plant, the drinking water processing plant and waste processing plant construction and factory and power plant installation. Some projects completed by WIKA include five crude palm oil (CPO), the Gresik fertilizer plant and a bio-diesel plant constructions, and nine Indocement projects. Some of the ongoing projects are the CPO plant in Malingping of West Java, and the Palimanan Cement Mill in Cirebon.



Inquiry Form
  Nama :  
  Email :  
  Message :  
       
   

The civil construction SBU consists of: road and bridge, irrigation, transportation infrastructure, and manpower. Currently, the Civil Construction SBU is not purely a contractor, but an adequate support Engineering Team that has carried out Design and Built works starting from the planning process to construction. The projects that it carried out included: the Cilacap Steam-powered Power Plant (PLTU) Coal Jetty, the Laut Island Wood Chip Jetty, the Manggarai Flood Canal Removable Trashrack. [ detail]

The Building Construction SBU is by law a separate subsidiary, however in implementation it is, due to the recognition given to the Company’s working experience, still in a transition period under the administration of the WIKA holding company. The Building Construction SBU at WIKA comprising the Residential Building Sub-Business and the Facilities Building Sub-Business, backed by its engineering skills, has carried out design and build works, namely from the planning process till the construction process. [ detail]

The Industrial Plant, Oil and Gas Sub -Business consists of sub units of mechanical-electrical construction services which include the constructions of oil and gas facilities, industrial infrastructure and steel fabrication. [ detail]

The Energy SBU carry out business in the field of EPC based construction which is integrated with the scope of work starting from basic engineering design, process engineering design, procurement related to equipment and construction or the construction of planned projects, is currently still limited to EPC Power Plant, whether it is civil construction or the EPC of a Power Plant. Several projects that were and are being carried out related to power plant include:
• Power Plant Civil Construction: PLTU Labuhan Angin, PLTU Labuan, PLTU, Pelabuhan Ratu, PLTG Muara Karang, PLTGU Tanjung Priok and PLTU Pacitan.
• EPC Power Plant: PLTU Amurang 2x25 MW, IPP PLTD Bali 50 MW, IPP Geothermal Electricity Generator 50 MW, PLTU Asam- Asam 2x65 MW South Kalimantan PLTU Cilacap 2x300 MW, Jawa Tengah 2x300 MW. [ detail]

Safety and Environmental Award
From: Mitsubishi Corporation-Tanjung Priok GFPPEP 740 MW
»More