Pengumuman

Waspada Terhadap Penipuan yang mengatasnamakan PT Wijaya Karya (Persero) Tbk.

WIKA tidak pernah melakukan kerjasama dengan biro perjalanan manapun, dan meminta peserta untuk membayar biaya akomodasi untuk kegiatan rekrutmen.

WIKA tidak bertanggungjawab atas kerugian materil yang diakibatkan dari penipuan tersebut.

Informasi lebih lanjut dapat menghubungi 021 80679200 ext. 50648.

Biro Rekrutmen dan Penempatan - Departemen Human Capital WIKA.

Indonesia′s Leading Integrated EPC & Investment Company

Investment


PLTD Ambon 25MW

PLTD Ambon 25MW

This Power Plant 25MW worth Rp200 Billion. Investment scheme that used for its power plant construction is rent build or BOO  (Build Operation Owned) for 4 years then handed to PT PLN.

PLTG Borang 2x30 MW, South Sumatera

PLTG Borang 2x30 MW, South Sumatera

This investment project is on Banyuasin district, South Sumatera. Development scheme for this Gas Power Plant uses Build-Operation-Transfer (BOT) scheme or rent buy between PLN and WIKA’s consortium for 7 years.

Surabaya – Mojokerto Toll Road

Surabaya – Mojokerto Toll Road

This highway are built on funding from PT Marga Nujyasumo Agung (Jasa Marga – Moeladi – WIKA) with a total length of 36,27km. This Toll road is a part of Trans Java Toll Road that consist of 4 sections : Section IA (Waru – Sepanjang), Section IB (Sepanjang – WRR), Section II (WRR – Driyorejo), Section III (Driyorejo – Krian) and Section IV (Krian – Mojokerto). Section IA and Section IV has already operated. 

Pesanggaran Gas Power Plant 50MW, Bali

Pesanggaran Gas Power Plant 50MW, Bali

The increasing activity of the community in Bali, so consumption of  electricity that have previously been so high. Until now, electricity demand in Bali reached 600 MW and 200 MW of which is supplied from outside Bali. Electricity demand in Bali for a year is expected to increase in the range of 10%, so that by 2017 the demand for electricity in Bali will reach 1,017 MW. Of the electrification ratio, Bali currently has a relatively high ratio of electrification when compared with other provinces, reaching 80%. That is, there are still about 20% of people who have not got the power supply.

As response for the construction of 10,000 MW power plant by the government as well see it as a business opportunity, WIKA and PT Mirlindo Padu Kencana (Mirlindo) build diesel power plants (diesel) fuel Marine Oil (MFO) 50 MW with total investment of IDR 558 billion in Pesanggaran Bali. WIKA’s composition (70%) and Mirlindo (30%). The project are Built, Operate, Transfer (BOT) for 8 years. Once the project is completed, the electricity will be sold to PT Indonesia Power at a price of IDR 446.14 per kWh without fuel.

Investment Product


SHARE PRICE

Wijaya Karya (Persero) Tbk. (WIKA.JK)

SUBSIDIARIES

INVESTMENT

PT WIKA Industri Energi
PT Jasamarga Surabaya Mojokerto
PT Jasamarga Kunciran Cengkareng
PT Jasamarga Bali Tol
PT WIKA Jabar Power
PT Prima Terminal Petikemas
PT Citra Marga Lintas Jabar
PT Pilar Sinergi BUMN Indonesia
PT Air Minum Indonesia
PT. Trans Pacific Petrochemical Indonesia TPPI
PT Jasamarga Balikpapan Samarinda
PT Jasamarga Manado Bitung
PT Wijaya Karya Serang Panimbang