WIKA's portfolio in developing airport infrastructure is increasing after being trusted by PT Angkasa Pura I (Persero) (AP I) for Design and Build Works for the Development of Sultan Hasanuddin Airport Makassar, South Sulawesi Phase I - Stage I - Package I. WIKA selected as the main contractor in The construction of the main airport in Makassar, it was marked by the Submission of the Winner Appointment Letter by the Director of Angkasa Pura I, Faik Fahmi, to the Director of WIKA, Tumiyana, at Grha Angkasa Pura I on Friday (2/15).
WIKA's scope in the development of this airport includes the construction of main building, expansion of the south side terminal, parking building, main terminal road access: connecting bridges, fly over and ground road, revitalization of existing terminals, and page making - airport mechanical electronic landscape.