President Director of WIKA Bintang Perbowo, Director of Operational 2 Bambang Pramujo along with the management attended the First Firing Units IIIA PLTU Jeneponto 2x135 MW Expansion in the Punagaya village, Bangkala district, Jeneponto Regency, South Sulawesi, on Sunday (23/7). The event was held by PT Bosowa Energy as the owner and also attended by Governor Syahrul Yasin Limpo South Sulawesi as well as the Regent of Jeneponto Iksan Iskandar.
PLTU Jeneponto 2x135 MW Expansion is a continuation of the previous 2 units that have supplied a total of 500 MW of electricity for the needs of the community in South Sulawesi. In this project, WIKA is currently working on civil work and concrete supply.