INDUSTRY
Majalengka Steel Fabrication, West Java
Steel fabrication owned by WIKA Construction Industry with a production capacity of up to 65,000 tons/year
ENERGY & INDUSTRIAL PLANT
Muara Karang Gas and Steam Powerplant, Jakarta
Simple Cycle generator with 400-500MW capacity that will increase the electric power of the Jakarta area
INVESTMENT
Jakarta - Bandung High Speed Railway Project
Indonesian Fastest Train with top speed of 350 km/hour
INFRASTRUCTURE & BUILDING
Construction of Kijing Port, West Kalimantan
An international modern port with the longest trestle in Indonesia
REALTY & PROPERTY
Merusaka Nusa Dua, Bali
Beachfront resort & spa located in an exclusive tourism area
INFRASTRUCTURE & BUILDING
The Longest Curved Span Precast Construction in Indonesia, Semanggi Interchange
with the total length of 1.6 km through its two ramps, the first ramp extends 796 meters and the second ramps extends 826 meters.
HUMAN CAPITAL
Supported by 2,100 talented people, including 1,498 engineers
GCG
Gratification Control
CSR
Corporate Social Responsibility
PRESS
News
-
- 07 Desember 2023
- WIKA Distributes Up to 1.9 Billion Aid for Cianjur Disaster ...
-
- 29 Desember 2022
- BPJT Inaugurates the 1.5 B WIKA Babahalun Mosque...
GOOD CORPORATE GOVERNANCE




